First two new air-conditioned trains now run on Cairo Metro Line 1
The first two of 55 new Alstom trains are carrying passengers on Line 1 between Helwan and New Marg, with air conditioning, CCTV, screens and wheelchair spaces.
Riders on Cairo's oldest metro line can now catch an air-conditioned train. The first two of 55 new trains built by France's Alstom have entered passenger service on Line 1, the Helwan to New Marg route that carries more people than any other line in the city.
Transport Minister Kamel Al-Wazir launched the trains with French Ambassador Éric Chevallier, the head of the National Authority for Tunnels, Tarek Goweili, and Alstom representatives, and rode one from Saray El-Qobba to Sadat, a trip through eight stations in between. The minister called the trains a major step in modernising the line and making it more efficient, comfortable and safe.
Each new train has nine carriages, and the full order covers 55 trains, or 495 carriages. Inside, the changes are the ones regular riders will notice first: air conditioning throughout, open connections between carriages so passengers can walk the length of the train, and CCTV in the driver's cabin and in every carriage, with the footage sent to the line's central control room. Passengers get LCD information screens, screens above the side doors showing the final stop, and lit electronic maps of the route and stations. There are marked spaces for wheelchairs with a way to secure them.
The contract with Alstom also covers eight years of maintenance, major overhauls and spare parts for each train, and new equipment for the Tora depot, which is being modernised to look after the new fleet and the older trains.
Line 1 runs for 44 kilometres with 35 stations. It opened as the first metro line in Africa and the Arab world, and its age shows in the heat of summer carriages and the gaps between trains at rush hour. The new trains are one part of a wider rebuild: 23 of the existing trains are being refurbished with a Spanish company, and an Egyptian and French group is replacing the signalling, communications, central control, track, power supply and electrical and mechanical systems.
The ministry is also preparing to tender a new station, Sheikh Mansour, between Ezbet El-Nakhl and New Marg at the northern end of the line. Beyond Line 1, the government says it plans a single control and monitoring centre for all its electric transport systems and a central control centre for the national railway network of about 10,000 kilometres.
No date has been given for when the rest of the 55 trains will arrive, and no new timetable or headway has been published. The minister said the aim of the upgrade is shorter waits between trains, more room for passengers and a more regular service.
For now, the new trains run in the normal timetable alongside the old ones, so which one pulls in is a matter of luck. Fares and tickets are unchanged: you pay at the gate as before, and the new trains stop at every station on the line, from Helwan in the south to New Marg in the north. As more of the 55 arrive, the share of air-conditioned trains on the line will grow; until the rest are delivered, the older trains carry most passengers.