EBRD lends up to $145 million for two Red Sea wind farms adding 500 MW
The two 250 MW farms near Ras Ghareb, owned by an Alcazar Energy fund, are also backed by the EIB and Germany's DEG, with EU risk cover.
The European Bank for Reconstruction and Development (EBRD) is lending up to US$145 million (€129.5 million) for two new wind farms on Egypt's Red Sea coast, which together will add 500 MW of power to the national grid. The bank announced the financing on 9 November.
The money is split into two loans. Up to US$75 million goes to Niat for Wind Energy and up to US$70 million to Alcazar Rasgha Energy. Both companies were set up for the projects and are owned by Alcazar Energy Partners II, a fund that invests in clean energy. The European Investment Bank (EIB) and Germany's development lender DEG are financing the farms alongside the EBRD, and the European Union is covering part of the first losses through its EFSD+ programme, which makes the loans less risky for the banks.
According to DEG, each farm will have 250 MW of turbines near Ras Ghareb, on the Gulf of Suez, one of the windiest stretches of Egypt's coast and already home to several of its largest wind projects. DEG says the lenders are putting in about US$437 million between them, in roughly equal shares, and that the two farms should generate more than 2.3 TWh of electricity a year. The EBRD puts the cut in emissions at about 979,700 tonnes of carbon dioxide a year.
The bank says the projects support Egypt's efforts to deal with power shortages, cut the fuel it has to import and move faster towards renewable energy. The EU's ambassador to Egypt, Angelina Eichhorst, described them as "500 MW of new wind capacity, cleaner skies and a more secure energy future for Egypt". The EBRD has invested more than €16 billion in Egypt across 238 projects, most of it in private companies.
For households, the farms will not change bills or supply straight away: building has to be completed first, and neither the EBRD nor DEG has given a date for when the turbines will start feeding the grid. What they add is more locally made power on a grid that has struggled with summer cuts in recent years, at a time when the government has also asked its own buildings to use less electricity.